欧美在线视频社区|外产+免费十无码|国产国模无码在线|www.欧美一区|东京无码在线|四虎影院福利视频樱桃视频|亚洲精品12p新丁香婷婷五月天|五月天成年人影院|青青草原亚洲不卡|黄色五月丁香停影音先锋色一区

Valve operating procedures

Column:Technical service Time:2019-12-14
shared:
1. The handwheel and handle of manual valve are designed according to the hand force of ordinary people, considering the strength of sealing surface and necessary closing force...

1. The handwheel and handle of manual valve are designed according to the hand force of ordinary people, considering the strength of sealing surface and necessary closing force.So you can't use a long lever or a long wrench.Do not force too much, too hard, or easy to damage the sealing surface, or break the hand wheel, handle.


2. Open and close the valve to force stable, not impact;


3. After the valve is fully open, the handwheel should be reversed a little to make the threads tight, so as to avoid looseness and damage;


4. For the stem valve, remember the position of the stem when it is fully open and fully closed, avoid hitting the dead point when it is fully open, and facilitate checking whether it is normal when it is fully closed, so as to find whether there is debris embedded in the sealing surface;


5. When the pipeline is initially opened, there are many internal dirty things, so the valve can be slightly opened, and the high speed flow of the fluid can be used to wash it away, and then gently closed (no quick closing or fierce closing to prevent debris damage to the sealing surface), then opened again, and repeated many times, rinse the debris, and then put it into normal operation;


6. If the handwheel and handle are damaged or lost, they should be completed in time. No adjustable wrench should be used instead to avoid damage to the valve stem square and failure to open and close;


7. During the operation, if any labor is found, the reasons should be analyzed.If the packing is too tight, can be properly relaxed, such as the valve stem askew, should be repaired.